2020-02-10

来自cslt Wiki
2020年2月11日 (二) 00:24Chenhaolin讨论 | 贡献的版本

跳转至: 导航搜索
People This Week Next Week Task Tracking (DeadLine)
Dong Wang
  • Completed investigation of LDA for PLDA
  • Completed TASLP draft
  • Help submission of the TASLP paper
  • More theoretical work on DNF
  • More coding work on DNF repository
Yunqi Cai
  • prepare the experiment data of the paper. Make a plan of next experiment stage. Clear up the previous experiment data.
  • Complete the sota SRE vector's test.
Zhiyuan Tang
Lantian Li
  • Clear up research proposal
  • Clear up code repository
  • NF + LDA/PLDA
  • NF + LDA/PLDA and DNF + GMM
Ying Shi
  • Finish research plan
  • Read code about AlignFlow
  • Finish experiment about double flow on spectrum and fbank
Wenqiang Du
Haoran Sun
  • completed code modification
  • perform experiments with lower dimensions
  • perfect expriments with numeric results
Yue Fan
Jiawen Kang
Ruiqi Liu
Sitong Cheng
Zhixin Liu
Haolin Chen
  • Read and modify code about Blow.
  • Start running experiments.