People |
Last Week |
This Week |
Meet Minutes |
Task Tracing(DeadLine)
|
Mengyuan Zhao |
- Finish Online-ASR Demo.
|
- Deliver Embedded-ASR engine to Fenyinta.
- Check and release TTS Demo.
- Write documents.
|
- Prepare a workshop(half a day) in Jan 2018 after Jan.20,2018.
- Put DEMO code into Gitlab before Jan.2.
- Draft documents for many engines: fnasr, fntts, deepfe....
|
- Online-TTS DEMO (Jan.20,2018)
- Online-ASR DEMO (Jan.20,2018)
|
Zhiyong Zhang |
- Finished the first version(draft) of technical solution document for THS。
|
- To integrate Merlin7 front-end linguistic extracting to KALDI.
|
- Finish validation before Jan.3, and deliver document to Myhexin.
|
|
Yang Wei |
- Test the cases that network is not stable.
|
- Continue test TTS pyserver
|
- Finish test multi-speaker, multi-emotion TTS model and engine before Jan.12.
|
|
Dong Wang |
- fenyinta contract done.
- spot discussion
|
|
|
|
Zhenlong Han |
- Train some model dark knowledge in tonghuashun
http://192.168.0.51:5555/cgi-bin/bugdb/cvss_request.pl?account=hanzl&step=view_request&cvssid=32
|
- English embedded model training.
|
- Finish train English model before Jan.8.
|
|
Shuai Zhang |
- Fixed bugs of the VVParrot.
- Test the VVParrot.
|
- Modify the edit-distance algorithm.
|
|
-
- the VVParrot will be shown 5th Jan.
|
Yanchi Jin |
- Already update the database.
|
- Complete the Megrez_tool and the chart of structure.
- Continue update the database.
|
|
|