“2023-11-13”版本间的差异

来自cslt Wiki
跳转至: 导航搜索
第19行: 第19行:
 
|Lantian Li
 
|Lantian Li
 
||  
 
||  
*  
+
* GPU status [https://z1et6d3xtb.feishu.cn/wiki/XGcGwRK5viJmpRkjH9AczIhynCh]
 +
* APT-group (OverlapASV, Ob-Code, AED)
 +
* ICCIP A-DA paper
 
||
 
||
*  
+
* ICCIP SE adaptor paper
 
||
 
||
 
*   
 
*   

2023年11月13日 (一) 10:49的版本

People This Week Next Week Task Tracking (DeadLine)
Dong Wang
  • SIP chapter 8
  • NC review
Lantian Li
  • GPU status [1]
  • APT-group (OverlapASV, Ob-Code, AED)
  • ICCIP A-DA paper
  • ICCIP SE adaptor paper
Ying Shi
Zhenghai You
  • Speakerbeam [2]
  • Aidemo
Chen Chen
Xiaolou Li
Zehua Liu
Pengqi Li
  • paper v1(2/3) and NC review
  • Thesis Proposal and concat silence exp
  • finish paper v1[5]
Wan Lin
Tianhao Wang
  • paper
  • PLDA & PSDA report
Zhenyu Zhou
  • Proposal[6]
  • ICCIP submit
  • Opening report
Junhui Chen
Jiaying Wang
  • obae with different length
  • randomness verification & solution(mask scheduler)
Yu Zhang
  • angleproto & LSH
Wenqiang Du
  • Fix bug about aibabel project
  • Release model about aibabel project
Yang Wei
  • Support Huilan ASR and TTS projects