“FreeNeb Status Report 2017-04-05”版本间的差异

来自cslt Wiki
跳转至: 导航搜索
 
第15行: 第15行:
 
|-
 
|-
 
|Zhiyong Zhang ||
 
|Zhiyong Zhang ||
* Contract with DataTang for 1000h data purchasing and other cooperation and exchange;
+
* Finished scripts for duration and acoustic model training of Merline.
* Exchange with THS team for the Third project;
+
* Start The TTS normalization of Merlin part.
+
 
||
 
||
* To finish the Merline experiments.
+
* To finish the residual jobs for wav generation of Merlin
 
||
 
||
 
* To re-produce the TTS using KALDI.
 
* To re-produce the TTS using KALDI.

2017年4月6日 (四) 02:17的最后版本

This Week:

People Last Week This Week Next Week Tast Tracing(DeadLine)
Mengyuan Zhao
  • Negotiation with tonghuashun.
  • Train 500h AM for roobo.
  • KT for tongfang.
  • nnet-forward for embedded asr.
  • nnet-forward for embedded asr.
Zhiyong Zhang
  • Finished scripts for duration and acoustic model training of Merline.
  • To finish the residual jobs for wav generation of Merlin
  • To re-produce the TTS using KALDI.
Yang Wei
  • Crawl 6G data from Internet
  • Crawl more data from Internet
  • Crawl more data from Internet
  • TongFang Janpanese 300G text lm traing(Deadline-20170407)
Dong Wang
  • draft contract with Xinsong
  • discuss potential opportunity speaker recognition
  • re-arrange company-lab relation
  • re-arrange company-lab relation
Mingrui Ruan
  • TTS schedule
  • review other schedule
  • Haitian agreement
  • cooperation with Shujutang
  • review other schedule
  • about FreeNeb
Zhenlong Han
  • In the roobo project to training a model used 760h.
  • Finish crawler documentation
  • Improve the acoustic model documentation.
  • Write how to run acoustic model documentation.
  • Train roobo model random linear classification and test WER.