|Yanchi Jin||
 
|Yanchi Jin||
* Complete the megrez_test and already deploied on the server.
+
* Collect a lot of feedback and then update the database of the Megrez.
* Start to use the megrez_tool complete same simple structure chart.
+
* Verify the Megrez_tool and modify the the graph.
 
||
 
||
* Complete the interface of megrez_test and the chart of structure.
+
* Complete the Megrez_tool and the chart of structure.
 +
* Continue update the database.
 
||
 
||
  

2017年12月11日 (一) 01:09的版本

This Week:

People Last Week This Week Next Week Task Tracing(DeadLine)
Mengyuan Zhao
  • Engineering
  1. Bug fix with TTS engine, and release TTS engine v1.0.
  • Engineering
  1. Try to adapt new model TTS model.
Zhiyong Zhang
  • Finished multi-speaker TTS/mono-speaker multi-emotion TTS.
  • Some problems on multi-speaker multi-emotion TTS, need more investigation.
  • To train duration-model using 16k data.
Yang Wei
  • Test FreeNeb TTS engine.
  • Test FreeNeb TTS engine.
Dong Wang
  • ICASSP
  • OC2017


Zhenlong Han
  • Finish training TDNN with different splice and cnn-tdnn model, and give conclusion to xiaohe.
  • Finish Uyghur model training.
  • English data prepare done.
  • English embedded model training.
  • Fill in document.
Shuai Zhang
  • Modify the VVParrot project.
  • Complete the VVParrot project.
  • Complete the Megrez project.
  • Add the documents about the two project.


Yanchi Jin
  • Collect a lot of feedback and then update the database of the Megrez.
  • Verify the Megrez_tool and modify the the graph.
  • Complete the Megrez_tool and the chart of structure.